Order INSUduct >

 

Click here for link to latest installation instructions. 

Standard INSUduct can take up to two 25mm diameter PE pipe (including barrier pipe)

or one 32mm diameter  (including barrier pipe) by removing the insulation through the centre of the product.

 

Please note that Groundbreaker installation can be made before or after the installation of INSUduct.

For ‘climbing’ INSUduct, repeat instructions rising up the face of the building (Bellmouth Fitting).

 

Images below indicate fixing options please also refer to installation instructions.

 

  

Pipes shown are optional extras and not part of INSUduct, please see order catalogue.

 

Developed and Hosted by Paston Chase